Cctv completion workflow v3 checklist
Checklist to ensure system has been installed correctly and in line with standards
What does this form include?
This form contains 44 sections:
All voltage, IP address, Camera Location details must be recorded below.
Camera Informaton
Location
Camera Model type :
Camera Voltage ( state POE or POC if applicable )
POE - Power over ethernet ( IP systems )POC - Power over Coax ( usually TVI or AHD systems)
Camera Recording method
IP ADDRESS OF CAMERA : ( If plug and play state )
Channel number :
Channel Number :
Camera 2 Details
- Recording set up frames per second ( FPS )
Camera 3 Details
- Recording set up frames per second ( FPS )
Camera 4 Details
- Recording set up frames per second ( FPS )
Recording Equipment information
- Number of Recorders installed
Recorder Type/Model
PSU and POE switch Tests and Locations
- PSU's /POE Switches fitted ( other than ones built into NVR )
PSU/POE Switch Voltage
Battery Capacity
Battery Capacity fitted if applicable
PSU/POE Switch Location
AS FITTED IMAGES
- Snapshot of As fitted images obtained
NVR/DVR Admin User name
NVR/DVR Admin Password
Add line for each manager or user account set up on install
NVR/DVR user name :
NVR/DVR User Password :
When setting up remote access via an app or software to remote view a system the following informatio
App/software information
- Does the customer have App/software remote viewing facilities
Cloud Storage set-up
- Does the system have remote cloud storage set-up
IP address information for steaming channel
Channel upload Bandwidth
User Authentication details : User name
User Authentication details : Password
3rd Party Interface's
- Guardian PA call system tested
- Access control link
- Intruder Alarm link
Handover checklist
- Cabling has been carried out in accordance with 18th edition wiring regulations (BS7671) how cables are support in the event of a fire- ie metal clips/ties used to support cable along entire route
- check that the Operation of all monitoring, switching, Multiplexing and recording equipment is satisfactory
Amendments to specification
- confirm that the Requirements of NCP 104 and BS EN 50132-7:1996 and all other relevant requirements are met and any changes to the specification are agreed and documented
Details of Changes to specification
Completion certificate
Add signature
I Sign to confirm that :I am happy to accept the installed system and that I have been given a demons
Customer/Customer's representative's Signature
Final sign off
- How would you rate the Installer and the quality of installation :
Customer Comments :
Engineer Signature
Use this template