Template Information
Cctv maintenance report
Category: agriculture
Template Questions
- Job Number
- Site Name
- Site Address Address
- Camera and Housing
- Check that the number of cameras, including lenses, are in accordance with the specification and system record.
- Test the camera outputs and re-adjust focus and video levels as required
- Clean both camera and housings and ensure lenses are dust free, interior of camera enclosures are clean and dry
- Check all glands and seals on external equipment. Inspect integrity of housings, bracketry, enclosures and power supplies
- Check the operation of infra-red power supplies and photocells for correct operation
- Check for sound physical fixings of all equipment including loosening or corrosion of supports and fixings including towers and brackets
- If PTZ or functional dome camera check operation of Pan and Tilt head zoom/focus and iris functions
- Report on any changes in camera coverage due to temporary obstructions Ie. Foliage
- Conditions/Actions required on above section also add photos below where required.
- Any photos required add here for condition/action report
- Cables and Wireless Transmission
- Check all cables, conduit and Copex's are properly supported and showing no signs of wear
- Check termination and resistance of coaxial cables
- Check that the signal is free of distortion, tearing, hum bars, EMI, and Rolling.
- If wireless links ensure line of sight is still achievable and that there are no obstructions from new buildings, vegetation etc.
- Any photos add here for Condition/Action report
- Control Equipment
- Make sure all video connectors are insulated from conduit and pull boxes
- Monitors are free from picture distortion and have correct brightness and contrast.
- Check all coaxial / IP connectors for loose connections
- Check power connections are not loose or frayed
- Check operation of digital video recorders, quad units, switchers, POE, etc and check validity of time and date on recordings
- Carry out a test recording and view from the camera including preset positions and check against handover documentation.
- If IP systems installed, check network switches, encoders, decoders, NVR's and management of system against back up taken at the time of handover.
- Check keyboard operations including Pan, Tilt and Zoom. Focus iris, wipers, presets, auto pan, etc. If PC operated check virtual functionality on the computer
- Conditions/Actions required on above also add photos if required below
- Any photos add here for condition report
- Part Transactions:
- List materials used including quantities, part description, serial numbers:
- List parts required including part numbers, voltages etc.
- Date and Time on site Date
- Date and Time off site Date
- Number of on site hours:
- Number of travel hours:
- Engineers name on behalf of BTS:
- BTS Engineers Signature
- Customer Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.
- Customer Job Title:
- Customers signature
- Office use ONLY:
- Actioned by:
- Date Closed:
- Building Technology Services, 119a Derby Street, Burton-on-Trent, DE14 2LE